Quantcast
Channel: SCN: Message List
Viewing all articles
Browse latest Browse all 8712

Re: Can you optimize my MIGO -> Bin Transfer Process

$
0
0

Hi Ryan,

 

As far as 261 mvt are concern you can very much control this via Control cycle, and no need to adjust the negative and positive Quant system will automatically do this please have a look on the below steps

 

for eg.

Master data one time setup per material : Define the control cycle record  using LPK1 and enter the Destination bin as a PSA Bin where u r transferring the stock as part of Step 1, Take the help from PP team to get the Production supply area

Transactional Data

Transfer the stock to PSA bin using BIN to Bin without considering the requirement before the start of the shift

 

At the line side operator consume the stock against any production order and pass the detail to system user and user post the detail using MIGO into SAP system, here i am trying to post the consumption against the first line item only

 

Order creation        60003889

 

Consumption posting

 

 

 

 

Stock after consumption posting

 

 

For Mvt 201/ 551 since system automatically creates TO you can ask the SAP team to remove the Auto to creation flag as shown below

IMG PATH

SPRO------LE---WM---ACTIVITIES----Define Movement type

 

 

Remove any value from the field Automatic TO, if it is blank system won't generate TO automatically


Viewing all articles
Browse latest Browse all 8712

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>