Hi Sarhan,
What we are doing is like, please let me know if this will work:
1. RFC connection between Production BW (Oracle) - 7.01 and BW on HANA system - 7.4.
2. Collecting objects from Production BW (Oracle) - 7.01 to transport BW on HANA system - 7.4
3. Then planning to do ETL from Production BW (Oracle) - 7.01 to BW on HANA system - 7.4
After that we will analyze the performance of report how it is on BW on HANA system - 7.4.
Do you think it is right approach?
Regards
Sweta