Hi,
Kindly check the below steps:
1) Check if the note 863509 is imeplemented in your system, and very importantly the exit is implemented properly and activated so that it is called during the order transfer
2)In case you have a scenario where a new material is added during production then in that case that material needs to be assigned to an activity, it shouldnt have an dummy acitivity.
BR
Gomathi