Hi,
In my opinion, you can proceed in following manner and test the settings,
- Make a Quality plan and name the Group as 'Cable'
- In this group, assign different task lists like Blue First layer (Gr Counter 1), Orange First layer (Gr Count 2), Green First layer (Gr Count 3) and so on.
- In each of the task list, assign two operations i.e Blue (Bundle 1) & Orange (Bundle 1).
- Assign MICs to these operations.
For the MIC part, you can make 12+12 Quant MIC for Blue, Orange, Green, Brown... Turquoise !!
See below snapshot for the reference.
This way you should be able to make a single inspection plan with different task list and operation as per the requirement.
Test it and revert back if you face any issue or get any query. If this doesn't work out, other possibility can be explored !!
ntn